logo
← For manufacturersManufacturer module
Module M1

Bill of Materials.

Multi-level BOMs with phantom BOMs, alternate items, scrap %, version control, and engineering change requests with approval workflow. The foundation of every MRP run, every work order, and every cost roll-up.

What's inside

Eight things you'll actually use.

01

Multi-level structure

Parent → sub-assembly → component → raw material. Drag-and-drop tree editor with copy/clone for similar BOMs.

02

Phantom BOMs

Group sub-assemblies for clarity without affecting MRP. Useful for documentation-only structures.

03

Alternate items

Define substitutes per line. MRP uses primary; planner can pick alternate when primary is short.

04

Scrap percentage

Per line scrap %, accounted in MRP and in standard cost. Variance vs actual scrap reported.

05

Version control

Every BOM has versions with effective dates. Old WOs reference old BOMs; new WOs use latest.

06

Engineering change requests

Propose a change, route for approval, optionally pilot on next N WOs before full rollout.

07

Routing & operations

Per-stage operations with workstation, setup/run time, and labour rate. Used by the work-orders module.

08

Cost roll-up

Roll up RM + labour + overhead automatically to compute standard cost per finished good.

Built for India

GST-aware. HSN-aware.

Every BOM line carries the HSN, GST rate, and unit-of-measure of the underlying item. Production output inherits the parent's HSN. No tax surprises at dispatch.

See BOM in action.

Free trial includes BOM templates for 12 common manufacturing categories.